01 · Fee method
Four ways to price a defined service.
The Council of Architecture's Manual of Architectural Practice recognises percentage of works, unit-area, lump-sum and man-hour approaches. Any method can be clear or misleading depending on how the service and exclusions are written.
- Percentage: define the cost-of-works basis and how changes affect the fee.
- Unit area: define which area and which deliverables the rate buys.
- Lump sum: define stages, revisions, meetings and change triggers.
- Time based: define roles, hourly or daily rates, caps and reporting.
02 · Reference
Read the CoA percentage with its scope.
CoA's current online scale lists 7.5% of the cost of works for an individual house and for interior architecture, and 5% for comprehensive architectural services on other buildings. The service pages describe a staged professional appointment. Reduced or additional services need their own scope and fee basis.
The cost-of-works basis excludes land. Surveys, soil investigation, statutory charges, specialist consultants, travel, models and day-to-day supervision should be identified rather than assumed.
- Brief and concept
- Design development and approvals support
- Working drawings, details and specifications
- Tender or contractor-selection support
- Periodic construction-stage review
- Completion and as-built information
03 · Compare
Put every proposal on the same service matrix.
A lower percentage may omit specialist coordination, working details or site reviews. A higher percentage may still exclude reimbursables and taxes. Compare the appointment line by line before comparing the total.
- Deliverables and issue stages
- Revision and meeting allowance
- Structural, services and specialist responsibility
- Approval support and authority fees
- Site attendance and bill certification
- Intellectual property, suspension and termination
- Reimbursables and applicable GST
04 · Payment
Pay against accepted deliverables.
Stage payments should follow the written appointment and identifiable outputs. Avoid a schedule that demands most of the fee before the information needed for construction exists. Record what acceptance means and what happens when the brief or project changes.