Quality and site records
Record what finishes will hide.
Agree the inspection point, responsible reviewer, required information and close-out evidence before concealed work is covered.
This is a record method, not a universal inspection checklist or certification promise.A simple observation trail.
Before closure
- Issued drawing or agreed reference identified
- Location and work item named
- Responsible reviewer confirmed
- Photographs captured where agreed
Before acceptance
- Observation described clearly
- Responsible action owner named
- Close-out evidence attached
- Status and date recorded
Typical record categories
- Waterproofing stages before covering, where specified
- Service routes before closing walls, floors or ceilings
- Reinforcement, embeds or junctions where the responsible consultant requires a record
- Material samples and approved references
- Snag or observation list and close-out status
- Handover documents and agreed photographic record
The project-specific architect, engineer, consultant or other responsible reviewer remains responsible for the inspections and certifications assigned to them.
Make the record part of the scope
Inspection points should not be improvised after closure.
Define which work needs review, who reviews it and what evidence is retained.
